Skip to content
Three-storey precast residence block with open walkways and an end stair at golden hour.

Developments/Industrial/Workforce accommodation

A village, not a camp.

Sleeping rooms, ablutions, kitchens and recreation buildings cast, fitted and inspected in the factory from one module family — permanent concrete accommodation that is still in good condition when the operation is in its second decade.

Storeys
1–3
Sleeping room
20m²
Building types
4
Module family
1

01The model

An operation runs for decades. Its accommodation should too.

Temporary camps are bought for the construction phase and then lived in for the life of the mine. Workforce accommodation is a repeating room — which is what volumetric precast casts best — so a village can be built as a single production run: residence blocks, ablutions, kitchens and recreation buildings with one finish specification and one inspection regime, in a material that does not tire.

Village layout, bed count, phasing and amenities are set by the operation and its workforce plan. The room, the wet core and the structural grid do not change with them.

Aerial view of a workforce village with three-storey residence blocks, a single-storey dining hall, a sports court and shaded parking.

Residence blocks around a dining hall, sports court and shaded parking

Residence block at golden hour.

The village

One room, engineered once — then repeated for every bed the operation needs.

  • Up to

    3

    Storeys

    Single-storey amenity buildings to three-storey residence blocks on the same grid.

  • 20m²

    Sleeping room

    One standard module — 6.05 × 3.25 m on plan, a private room with bed, desk and full-height wardrobe.

  • 98m²

    Dining hall bay

    Five standard modules side by side — 6.05 × 16.25 m, a column-free hall that grows by whole modules.

  • 4

    Building types

    Residence blocks, ablutions and laundries, kitchens and dining, recreation — from one module family and one finish specification.

Areas and dimensions are indicative and confirmed at design freeze for each village. Bed count, storey count, amenities and village layout are set per operation.

02Where this model sits

A place to live, not a camp at the edge.

Staff and workforce housing belongs inside the community it serves. In a Precast Africa integrated precinct, residence blocks for the people who run the place sit within the apartment band, sharing its courtyards and civic ground.

Infrastructure diagram — the workforce accommodation site layout: buildings, access roads, parking and landscaping.

Zone 04

Apartment precinct

Multi-storey blocks around shared courtyards — the densest residential band, placed closest to the civic ground.

In a precinct, this model delivers staff residence blocks within the apartment band. The built zones below are the community planned around it.

  1. Zone graphic — gatehouse with booms and separated entry and exit lanes.

    01

    Security gate precinct

    Controlled entry at the precinct boundary.

  2. Zone graphic — detached homes on individual stands.

    02

    Full-title homes

    Detached homes on their own stands.

  3. Zone graphic — townhouse rows along a shared landscaped court.

    03

    Townhouses

    Rows of homes along shared courts.

  4. Zone graphic — multi-storey residential blocks around a courtyard.

    04 · This model

    Apartment precinct

    Multi-storey blocks around courtyards.

  5. Zone graphic — mixed-use buildings around a public square.

    05

    Mixed-use centre

    Shops, offices and homes around a square.

  6. Zone graphic — civic buildings, sports court and play areas.

    06

    Civic & recreation

    School, clinic, sport and the shared lawn.

See the full integrated development

03Building types

Four buildings. One village.

Each building is a different arrangement of the same modules — so a village can add a block of rooms or a second dining hall as the workforce grows, without new engineering.

Specify the village the workforce plan needs. Residence blocks carry the rooms, wet-core modules take the ablutions and laundries, and dining and recreation halls are standard modules set side by side. All share one grid and one finish, so the production line does not change as the village grows.

Renders are computer-generated visualisations — illustrative and not dimensionally binding.

Module bills, room areas and finishes are confirmed at design freeze. Building mix, bed count and village layout are set per operation.

04Specification

The brief, and the modules that build it.

Every figure below is a module count on one structural grid — fixed at design freeze, so what the drawing shows is what the factory produces.

Typology
Permanent workforce villages
Storeys
Single to three storeys
Area
20 m² per sleeping room
Accommodation
Sleeping rooms, ablutions, kitchens, recreation
Modules
1 module per sleeping room
Structure
Volumetric precast concrete

Module bill — one level of a ten-room residence block

ModuleQtyL × W × H
Standard Module106.05 × 3.25 × 3.035 m
Wet-Core Module26.05 × 3.25 × 3.035 m
Total12modules per one level of a ten-room residence block

05Factory finish

Fitted in the factory, inspected before it reaches site.

Joinery, wardrobes, lighting, flooring and wet areas are installed indoors, so a room arrives ready for a mattress rather than for trades — however remote the site.

  • Private sleeping room with bed, desk and wardrobe.

    Sleeping room

    One standard module

  • Dining hall with servery and long tables.

    Dining hall

    Servery kitchen · clerestory light

  • Residence block stair core.

    Stair core

    Arrival and vertical circulation

  • Residence block in daylight.

    The block

    Walkway access on every level

  • Workforce village from above.

    Village

    Blocks, hall, court and parking

Scroll to explore

Three-storey precast residence block with walkways on every level.

06Built for the life of the operation

What workforce accommodation has to get right.

A village is judged twice — when the first shift moves in, and years later when it is still housing people. Mining houses have paid for camps that pass the first test and fail the second. The system is organised around both.

  1. 01

    Condition that lasts

    Concrete does not rack, delaminate or rust through. Rooms hold their condition across the full life of an operation instead of being refurbished or replaced mid-way.

  2. 02

    Built for remote sites

    Rooms are finished in the factory and arrive complete, so the work that has to happen at a remote site is foundations, placement and connections — not every trade a building needs.

  3. 03

    Rest between shifts

    Dense walls and floors keep a neighbour's alarm or a returning shift out of the next room, and thermal mass evens out the day's heat for people who sleep through it.

  4. 04

    Grows with the workforce

    A further residence block or hall is the same modules on the same grid, so a village can be phased with the operation rather than built for its peak on day one.

07Delivery scope

What arrives complete, and what the village decides.

Each building is delivered finished — structure, services, fittings and finishes installed and signed off in the factory. Everything beyond the building is a village-level decision the model is engineered to accept.

  • Private sleeping rooms
  • Factory-tested ablutions
  • Laundries & kitchens
  • Dining & recreation halls
  • Dense, quiet walls
  • Life-of-operation finishes
  • Covered walkway access
  • Solar-ready roofs
  • Rainwater provision
  • Data-ready service routing
  • Access-controlled village
  • Shaded parking

Module bills, typical block and room plans and the finish specification are issued on request, with a phased delivery programme built against your workforce plan. Tell us the operation and we will price the model against it.

Discuss a village

Next step

Specify the village.

Send us the site, the bed count and how the workforce will grow. We will come back with a building mix, a village layout and a phased delivery schedule you can take to an operations committee or a board.

Discuss a project

Computer-generated visualisations, illustrative only. Plans are indicative and not dimensionally binding. Module bills, room areas, finishes and programme are confirmed at design freeze for each village and are subject to statutory approvals and the applicable accommodation standards. Delivered-project evidence is issued as a dated annexure.