Four-storey precast office block with timber-clad bays and full-height glazing at golden hour.

Developments/Commercial/Office blocks

Floorplates, finished before fit-out.

Office buildings assembled from one module family on a grid that repeats floor to floor — services, ceilings and finishes completed in the factory, so a tenant's fit-out starts against a finished shell rather than behind the last trade.

Storeys
2–6
Open-plan bay
103m²
Typical floorplate
245m²
Structural grid
1

01The model

An office floor is a repeating bay. The factory casts the bay; the tenant chooses how to use it.

Office buildings are sold on floorplate and delivered on programme. Here the floorplate is a set of wide modules laid side by side against a core of standard modules, and the same set repeats on every storey — so a developer can price, programme and let the building one floor at a time, and a second or third storey is more of the same lifts rather than new engineering.

Site layout, parking, the entrance and the number of storeys are set by the site and the tenancy. The bay, the core and the structural grid do not change with them.

Four-storey office block three-quarter elevation in daylight, with balconies along the long face.

Four storeys on one grid · the bay repeats floor to floor

Office block at golden hour.

The building

One floorplate, engineered once — then stacked for as many storeys as the tenancy needs.

  • Up to

    6

    Storeys

    From a two-storey business-park building to a six-storey block, on the same grid and the same core.

  • 103m²

    Open-plan bay

    Four wide modules side by side — 6.05 × 17.0 m on plan, a column-free working floor.

  • 245m²

    Typical floorplate

    Two open-plan bays and a two-module core — ten modules to a floor, repeated on every storey.

  • 51m²

    Cellular suite

    Two wide modules — 6.05 × 8.5 m — for offices, boardrooms or a small tenancy with its own door.

Areas and dimensions are indicative and confirmed at design freeze for each building. Floorplate, storey count and site layout are set per scheme and are subject to statutory approvals.

02Where this model sits

Workplaces where people already are.

Offices belong on the main approach, beside shops and services, within walking distance of the homes they employ. In a Precast Africa integrated precinct, office floorplates sit in the mixed-use centre.

Infrastructure diagram — the office blocks site layout: buildings, access roads, parking and landscaping.

Zone 05

Mixed-use centre

Shops, offices and services at ground level with accommodation above, gathered around a public square on the main approach.

This model delivers the office floorplates of the mixed-use centre. The built zones below are the community planned around it.

  1. Zone graphic — gatehouse with booms and separated entry and exit lanes.

    01

    Security gate precinct

    Controlled entry at the precinct boundary.

  2. Zone graphic — detached homes on individual stands.

    02

    Full-title homes

    Detached homes on their own stands.

  3. Zone graphic — townhouse rows along a shared landscaped court.

    03

    Townhouses

    Rows of homes along shared courts.

  4. Zone graphic — multi-storey residential blocks around a courtyard.

    04

    Apartment precinct

    Multi-storey blocks around courtyards.

  5. Zone graphic — mixed-use buildings around a public square.

    05 · This model

    Mixed-use centre

    Shops, offices and homes around a square.

  6. Zone graphic — civic buildings, sports court and play areas.

    06

    Civic & recreation

    School, clinic, sport and the shared lawn.

See the full integrated development

03Floorplate

Bays, suites and a core. One floorplate.

Every floor is an arrangement of the same wide and standard modules — so a floor can be let whole, split between tenants, or re-planned without new engineering.

Specify the floor the tenancy needs. Open-plan bays carry the working floor, cellular suites take offices and meeting rooms, and the core holds the stair, ablutions and tea point. All three share one grid and one finish specification, and all three arrive with services and ceilings installed.

Renders are computer-generated visualisations — illustrative and not dimensionally binding.

Module bills, floor areas and finishes are confirmed at design freeze. Floorplate mix and tenancy splits are set per building.

04Specification

The brief, and the modules that build it.

Every figure below is a module count on one structural grid — fixed at design freeze, so what the drawing shows is what the factory produces.

Typology
Low- and medium-rise offices
Storeys
Two to six storeys
Area
245 m² per typical floorplate
Accommodation
Open-plan bays, cellular suites, core
Modules
10 modules per floorplate
Structure
Volumetric precast concrete

Module bill — a typical floorplate — two open-plan bays and a core

ModuleQtyL × W × H
Wide Module86.05 × 4.25 × 3.035 m
Standard Module26.05 × 3.25 × 3.035 m
Total10modules per typical floorplate — two open-plan bays and a core

05Factory finish

Fitted in the factory, so the tenant fits out a finished floor.

Ceilings, lighting, flooring, glazing and wet areas are installed indoors, so the handover is a finished shell a tenant's own contractor can start on the day it is signed over.

  • Open-plan office floor with desks and full-height glazing.

    Working floor

    Four-module open-plan bay

  • Double-height entrance lobby with a timber reception desk and a stair to the gallery.

    Lobby

    Reception and stair · set per building

  • Canopied office entrance.

    Entrance

    Deep canopy over the front door

  • Office block elevation in daylight.

    The block

    Full-height glazing, timber-clad piers

  • Office building and solar carports from above.

    Site

    Parking under solar carports

Scroll to explore

Open-plan office floor with polished concrete and daylight from full-height glazing.

06Built to let

What an office build has to get right.

An office building earns from the day a tenant moves in, and a tenant moves in on the day their own fit-out finishes. The system is organised around getting to that day with no surprises.

  1. 01

    A shell date you can let against

    The handover date is set at design freeze and held by factory production, so a leasing agent can commit a tenant's occupation date before the building is on site.

  2. 02

    Fit-out against a finished floor

    Ceilings, lighting, power and data are in before the module travels. The tenant's contractor installs furniture and partitions, not the base build.

  3. 03

    The floorplate repeats

    Every storey is the same set of modules on the same grid, so adding a floor adds lifts, not engineering — and a floor can be split between tenants without moving structure.

  4. 04

    Cool, quiet floors

    Concrete's thermal mass evens out the day's temperature swing, and its density keeps one tenancy's noise out of the next.

07Delivery scope

What arrives complete, and what the tenancy decides.

Each floor is delivered finished — structure, services, ceilings and finishes installed and signed off in the factory. Everything a tenant brings is a fit-out decision the floorplate is engineered to accept.

  • Column-free open-plan bays
  • Cellular offices & boardrooms
  • Factory-tested ablution cores
  • Data-ready service routing
  • Power & lighting installed
  • Provision for HVAC
  • Dense walls between tenancies
  • Non-combustible structure
  • Solar-ready roofs
  • Balconies & shaded façades
  • Parking & solar carports
  • Shell date fixed at design freeze

Module bills, typical floorplates and the base-build specification are issued on request, with a delivery programme built against your leasing timeline. Tell us the building and we will price the model against it.

Discuss an office building

Next step

Specify the building.

Send us the site, the lettable area you need and the date a tenant must move in. We will come back with a floorplate, a storey count and a delivery schedule you can take to an occupier or a board.

Discuss a project

Computer-generated visualisations, illustrative only. Plans are indicative and not dimensionally binding. Module bills, floor areas, finishes and programme are confirmed at design freeze for each building and are subject to statutory approvals. Tenant fit-out is outside the base-build scope unless agreed. Delivered-project evidence is issued as a dated annexure.